Most of what determines next season has already been decided by the time next season starts.

The hiring criteria, the onboarding, the inspection standard, the way callbacks get recorded or not recorded: all of that is set in the quiet months and then simply runs, at volume, from spring onward. By April there is no time to think about any of it, which is why so little of it ever changes.

Next year is decided between November and March

In a busy month, nothing structural gets fixed. Routes need covering, customers need answers, and every hour belongs to something already in motion. That is not a failure of discipline. It is arithmetic.

Which means the window for changing how the work gets done is now, and it is about four months wide.

Three questions worth answering before spring

Not twenty. Three, because three can actually be finished.

Who are you going to hire, and on what basis. What does your onboarding consist of, specifically. And what are your callbacks costing you.

Each one is answerable in an afternoon. None of them is answerable in May.

First: who you hire, and on what basis

Most hiring in this industry is decided on license status, years in the field, and previous employer, because those three are easy to check. They are also weak predictors of who will be good at the work in two years.

The traits that predict it are curiosity, empathy, conscientiousness and coachability, and none of the four can be taught afterward. The technical knowledge can be, on a schedule you can plan.

If you have never written your hiring criteria down, the criteria are whatever the person doing the interview happens to value that week. Writing them down is most of the improvement. I have set out the longer version of this argument in what you are actually hiring a technician for.

Second: what your onboarding actually consists of

There is the onboarding in the handbook and there is the onboarding that happens. Write down what happened to your most recent hire, hour by hour, for their first three weeks.

Most operators discover two things in that exercise. The classroom portion ran first and the field portion ran second, which is backwards. And the field portion consisted of the new person watching somebody else work, which teaches very little, rather than the new person working while somebody else watched, which teaches a great deal.

The sequence that works, and the schedule of checks that keeps it working, is in how much field training is enough.

Third: what your callbacks cost you

Almost every operator has a number in their head for callbacks and almost none of them have the real one, because callbacks get absorbed into routes rather than recorded as events.

The cost is not the revisit. The cost is the revisit plus the route time it displaced plus the proportion of those accounts that cancel within a year. Until you have that total you cannot tell whether a training problem is expensive or trivial, so it stays unprioritized.

The method for working it out is in how many callbacks are normal, and what do they cost you.

What the records will not tell you

One warning about this exercise. Your documentation will look better than your operation.

Sign-in sheets, ride-along logs and completed service forms all record that something was scheduled. None of them records whether anybody learned anything or whether the building was actually inspected. If you audit yourself on paperwork you will conclude that you are in good shape, and the conclusion will be wrong.

The check that works is asking a technician a question about an account and comparing the answer to the record. That takes ten minutes and tells you more than a file review.

Why April is too late

By April the decisions have already been made by default. The hire you did not plan for gets made under pressure, from whoever applied. The onboarding you did not design becomes two weeks of ride-alongs because there is no alternative. The callback cost you never measured goes on being absorbed.

None of those are bad decisions. They are the absence of decisions, made at the only speed available in a busy season.

The operators who have a better year are not working harder in July. They decided something in January.

Four hours a month

I keep four one-hour slots open each month for pest control operators under a million dollars in annual revenue who are seriously trying to build something. No cost and nothing attached to it. No proposal at the end.

The reason is straightforward. In forty four years across seventeen countries I have watched good operators make the same avoidable mistakes in the same order: hire on the wrong criteria, train informally, then lose technicians and watch customers leave with them. I would rather help somebody see that coming than watch it happen again.

If that is you, the slots are at the pro bono program page. If it is not you but you know somebody it fits, send it to them.

Where to start

Take one of the three questions, not all three. Write the honest answer down on a single page, including the part you would not say to a customer.

Then decide one thing you will do differently from the first hire of next season. One change, carried out properly, beats four changes announced in March and abandoned by June.